Sc200 200 Construction Building Elevator Offered by Hstowercrane

Sc200 200 Construction Building Elevator Offered by Hstowercrane

SC200/200 CZPT Constructing CZPT provided by hstowercrane
Product Description

CZPT lifts (also identified as construction elevator) is commonly used in personnel and materials construction vertical elevate transportation. In industrial or civil, large bridges, silos, are indispensable to good transportation amenities.


P
rominent Features of CZPT Lift 
1. Mast section welded by welding Robot ensures reliable quality and elegant appearance.
2. All the steel structures are processed with blasting technology to remove rust. The adhesion of surface painting is outstanding. 
3. Suspension cage guarding board adopts figured aluminum plate and numerical control punched aluminum plate. The suspension cage is lightweight and artistic in appearance. 
4. Driving mechanism supplied by the professional manufacturer with high efficiency, long service life and stability in performance.
five. Complete set of overload protection devices, variety of limiters and mechanical chain devices ensure its reliability.  Anti-falling safety device adopts SAJ40-1.2, which restricts the excessive downward movement of the cage, preventing and eliminating accidents.
six.CZPT elevator with frequency inverter is safe, stable and comfortable. CZPTting electricity is smaller than working electricity, energy-saving and high efficient.

The Mast part(coloration is variable or galvanized) is manufactured of seamless pipe.
 (The high good quality seamless steel pipe is great verticality, anti-strain, anti-ageing, thickness and so on)
 
 
Finished safety steps
1. Equipped with Anti-falling governor.  
2. CZPTal an Mechanical interlock: CZPT security switches, Slack rope switch.
three. Safety hook.
4. Upper and base limit switches, entice door restrict swap.
5. Overload protector.
six. Bottom Buffer.
7. Frequency Conversion (Inverter) for select.
8. PLC Management method for choose choose.
9. Level Calling program and Car leveling gadget for choose choose.
 
HSJJ — Build the long term with you.
 
Tech datas

Parameter Unit Model
    SC100 SC100/one hundred SC200 SC200/200
Rated capacity kg a thousand 2×1000 2000 2×2000
Number of people No. 12 2×12 sixteen 2×16
Rated lifting speed m/min 33.four 33.4 33.four 33.four
Max.lifting height m a hundred and eighty one hundred eighty a hundred and eighty a hundred and eighty
Motor power kw 2×11 2×2×11 3×11 2×3×11
Suspension cage size m 3×1.5×2.five 3×1.5×2.five 3×1.5×2.five 3×1.5×2.five
Weight of 650 standard section kg 124 148 124 148
Dimension of 650 standard section mm 650×650×1508 650×650×1508 650×650×1508 650×650×1508
counter weight kg = = = =
Suspender loading capacity kg two hundred 200 two hundred two hundred
Dimension of 800 standard section mm 800×800×1508 800×800×1508 800×800×1508 800×800×1508

 
CZPT product high quality, competitive price guarantee bare minimum market, Welcome partners to strategy to inspect, examine in design building lifting tools, enterprise negotiations, and sample processing, in order to have a superb potential and a harmonious romantic relationship.
 
1. Staff and supplies construction building lifting equipment  of widespread types: 
Merchandise Specifics
 

  1. Creating process:  

Strict content assortment-  blanking- inspection – welding-inspection- Blasting – inspection -Baking finished or galvanized- inspection -Completed solution
The merchandise can be CZPT according to customers’ demands (drawing, technical specs and so on). 
 
B. Particular style for Cage :
1. bottom and roof of Cage adopt  trapezoidal frame  
two. Bottom and the roof are full symmetry  
three. The aircraft of symmetry are related by  Bending plate,  Bending channel and  square pipe which make it  firm, straight and stability in use.  
4. The wall close to cage can be fixed by Punched  Aluminum plate, Punched zinc plate, steel wire mesh.
5. Surface Therapy: Blasting, Baking concluded,Galvanized
 
C. Workshop Information and Transport Particulars:
1. All Creation Line adopt regular of the fixture, mould, gauge
2. Each and every CZPT Raise should be tests-run and adjustment in Manufacturing facility
three. Workshop 5S administration design
 

 

Sc200 200 Construction Building Elevator Offered by Hstowercrane

Tags