DIN 2393-2 DIN 2393 Cold Drawn Welded or ERW Carbon Steel Tube

DIN 2393-2 DIN 2393 Cold Drawn Welded or ERW Carbon Steel Tube

Part I: Production INTRODUCTION
one. Commodity Description: Cold drawn ERW metal tube, also named DOM tubing, is a type of drawn more than mandrel welded metal tube. This kind of tube has ideal surface situation,concentricity,and substantial tensile energy. 
2. Commodity: DIN 2393-two cold drawn welded/ERW metal tube
3. Measurement Assortment: two0mm*2mm-325mm*15mm

four. CZPT specification&steel grade:

ASTM/ASME: ASTM A512 MT1571,MT1571
EN: EN10305-2 E195, E235,E355

5. Manufacture technique: hydraulic chilly drawn

six. Supply problem:

BK BKW BKS GBK NBK
+C +LC +SR +A +N
Chilly rolled Chilly drawn Tension relieved Annealed Normalized

7. Stop end: simple finishes with square cuts,free of charge of burrs.

8. Marking: as for every request

9. CZPT export packing: in bundles tied with steel strips. Int&ext oil coating. Exterior packing by PVC luggage and knit bags.

ten. CZPTized packing and marking are CZPT upon ask for.

Cold DRAWN ERW Steel TUBES: OIL Painting FOR ANTI-RUST Protection

Chilly DRAWN ERW Metal TUBES: PACKING

 

Portion II: Often Requested Inquiries
one. MOQ: 
CZPTly, Min Purchase Quantity can be 1 ton/measurement.
2. Delivery Time: CZPTly, our delivery time is close to twenty-35 days dependent on availability of uncooked content.
3. Guarantee&Promise: Warranty&guarantee time period is 6 months considering that we supply the tubes, and we are not liable for quality difficulty brought on by incorrect unloading or storage soon after cargo. We welcome customer’s inspection just before shipment. 
4. Payment Method: We accept payment method like T/T, L/C, or D/P, but it depends on our investigation about consumers. We have a solution to consider the credit score of buyers from all over the entire world, and time and quantity of D/P we can launch is established by the evaluation. 
five. Top quality Handle: ninety% of the tubes are made from sizzling rolled seamless pipes. So, top quality of raw materials identified top quality of concluded tubes. We acquire uncooked substance from secure suppliers who are foremost steel mills, and we examine the uncooked materials as for each the technical specs. For the duration of our generation process, there is inspection and high quality management in each and every stage.

Component III: Organization INTRODUCTION
We are a manufacturer of chilly drawn, cold rolled, and hydraulic cold drawn steel tubes with OD upto 356mm considering that 2002. Covering an location of about 32000M2, we have twelve standard workshops with  2 hydraulic cold drawing benches, 4 chain chilly drawing benches, and two ERW mills. Our services handles all the production techniques from pickling, chilly drawing,heat dealing with,saw slicing, straightening,inspection,packing to more machining &turning, cold drawing die fabrication, and gear repairation&routine maintenance.

Manufacturing unit Look:

Raw Materials Inventory:

Chilly DRAWING DIE WAREHOUSE:

HYDRAULIC Chilly DRAWING:

MULTI-ROLLER SRAIGHTENING:

STRAIGHTENING BY Push: 

Saw Cutting: 

LATHES: 

HONING:

 

DIN 2393-2 DIN 2393 Cold Drawn Welded or ERW Carbon Steel Tube

Tags